logo
Social Media
picasa
twitter
youtube

  • Home
  • Team
  • Blog
  • Vehicles
    • SubjuGator 7
    • SubjuGator 6
    • SubjuGator 5
    • SubjuGator 4
    • SubjuGator 3
    • SubjuGator 2
    • SubjuGator 1
  • Media
  • Press
  • Outreach
  • Sponsors
  • Contact



Frame Assembly

May 22, 2011
by nfischer
assembly, manufacturing
0 Comment

The first assembly of the frame with the computer pressure vessel and the navigation pressure vessel was completed this weekend. Everything went together smoothly and the hinges are performing exactly as designed. We’re very excited to have all of the manufacturing finished. The remaining parts will be anodized and delivered next week for final assembly, electronics insertion and wiring! Additional assembly photos are posted here: 2011 Manufacturing.

[singlepic id=716 w=320 h=240 float=center]

Leave a Reply Cancel reply

*
*

captcha *

Categories

  • Competition News (6)
  • Team News (29)

Tag Cloud

assembly auvsi buoy competition controller dvl ethernet grabber hydrophone manufacturing merge board pcb pipe pool rain testing thrusters trajectory generator travel Twitter

Tags

assembly auvsi buoy competition controller dvl ethernet grabber hydrophone manufacturing merge board pcb pipe pool rain testing thrusters trajectory generator travel Twitter

Latest Tweets

  • Twitter feed loading

Contact Us!

Countdown to AUVSI

51
Days
22
Hours
31
Mins
30
Secs





Machine Intelligence Laboratory | University of Florida
Login